Historical Markers StoppingPoints.com Historical Markers, Sightseeing & Points of Interest Scenic Roads & Points of Interest
About Us | Photo Gallery | Free Widgets | Featured States | Search Site
Home North Carolina Buncombe County City of Ridgecrest Historical Markers Swannanoa Tunnel
     

Swannanoa Tunnel

US 70, Ridgecrest, NC, USA
  North Carolina State Historical Marker
 
    North Carolina State
Historical Marker
    Marker Text:
"Longest (1,800 ft.) of 7 on railroad between Old Fort and Asheville. Constructed by convict labor, 1877-79. West entrance 300 yds. S.E."
     Western North Carolina Railroad’s Swannanoa Tunnel opened on March 11, 1879. At a length of 1,800 feet, it was the longest of the seven tunnels on the railroad between Old Fort and Asheville. The milestone in the development of western North Carolina opened the region and released it from its state of isolation. Before the construction of the railroad, the Buncombe Turnpike was Western North Carolina’s primary connection to the outside world. When the drought of 1845 resulted in total crop failure for mountain farms, pack trains and loaded wagons were unable to provide the frontier families with enough food to carry them through to the next crop. As a consequence, political leaders in the mountains demanded that the state provide a railroad link to Asheville. Ten years later the General Assembly finally passed legislation for the construction of a western North Carolina railroad connection.

     By the beginning of the Civil War, all but seventy miles of the route into Asheville was complete. During Reconstruction, the state secured four million dollars in state bonds for the completion of the railroad. However, George W. Swepson, in his capacity as president of the western division of the Western North Carolina Railroad (WNCRR), and Milton S. Littlefield embezzled the bonds, further delaying the railroad’s completion. Construction of the railroad did not resume until 1877 when the WNCRR was organized with the state holding three-fourths of their stock. The General Assembly authorized the use of 500 convicts to provide the labor for the project.

     James W. Wilson, who became president, superintendent, and chief engineer of the WNCRR, oversaw its completion. The hazardous construction involved drilling holes in the mountains of solid rock, blasting the rock, and removing the rubble. Wilson hired an engineer who introduced nitroglycerine as an explosive to replace black powder. The explosive paste that the engineer created using nitroglycerine, sawdust, and corn meal dislodged larger rocks. One hundred and twenty-five men lost their lives during the construction of the Swannanoa Tunnel. The tunnel was holed through on March 11, 1879. By October of 1880, the tracks were clear and the first train from Salisbury entered Asheville. Asheville was not the end of the line for the WNCRR, but rather it pushed farther down the French Broad River to Paint Rock and ended in Murphy in 1891.


References:
Asheville Citizen-Times, March 7, 1954
William S. Powell, North Carolina Gazetteer (1968)
George William Swepson Papers, Southern Historical Collection, University of North Carolina at Chapel Hill
   
Related Themes: C.S.A., Confederate States of America, Confederacy
 
Explore other
North Carolina Civil War Historical Markers.